COMPLY WITH THE ELECTRICITY ARRANGEMENTS

SenNet Power Control allows for processing the instructions from the distribution network operator (DNO) and setting up the inverters of the station adjusting the power according to the legal regulations.

The solution, SenNet Power Control is based on a GPRS datalogger with integrated digital inputs and outputs. Though the inputs, the datalogger can monitor the utility meter in real time, in order to meter the output power of the station; furthermore, through the gprs router, it can receive and process the orders of the control centre. Finally, the digital outputs can be used to switch on and off the devices to comply with these orders.

In addition, the same equipment can be used for Real Time Telemetry (RTT) and for monitoring the whole power station. It can be also integrated into a SCADA.

Optionally, a touch screen adapted to industrial environments can be installed to display the orders received and to confirm the reception manually.

Control de potencia en generación

ADVANTAGES PROVIDED BY THE SOLUTION

  • Integrable: Accepts most devices and works with most software platforms
  • It helps you to comply with::
    • Despatch Advice Management
  • Remote control
  • Compatible: Accepts most devices and works with most software platforms.

If you have any questions about our solutions and applications
You can request more information.

PRODUCTOS RELACIONADOS

Datalogger SenNet DL172

Datalogger SenNet DL171

Datalogger SenNet DL170

Datalogger SenNet DL151

Datalogger SenNet DL150

OWA 31 I